Complete ReleaseKit adoption roadmap

This commit is contained in:
2026-11-04 03:04:15 +00:00
parent 2cde616ce5
commit 289a171e97
2 changed files with 14 additions and 10 deletions

View File

@@ -1,6 +1,6 @@
# ReleaseKit v0.9.0 implementation plan
Status: Stages 1–5 complete; Stage 6 is not started.
Status: Stages 1–6 complete.
Implement these stages in integer order during one end-to-end sprint. The target
audience is the Luna coding agent. Intermediate stages may temporarily leave
@@ -98,7 +98,8 @@ under the local commit policy.
**Completed.** Go 1.26.8 selected and downloaded v0.9.0; tidy changed only
the tool requirement and its two checksum entries. The helper reported
`releasekit v0.9.0` under foreign target and workspace settings without changing
module metadata. Documentation alignment and snapshot checks follow.
module metadata. In accordance with the requested per-stage commits, metadata
was committed separately before documentation alignment and snapshot checks.
From the repository root, put Go 1.26.8 on `PATH` using the existing
[toolchain setup](../release.md#release-toolchain). Use normal dependency
@@ -302,7 +303,11 @@ accurately. These results complement Stage 4; they do not authorize a release.
## Stage 6: Review completion evidence and finish the sprint
**Status:** not started.
**Completed.** The complete diff was reviewed against the feature roadmap.
The only Go source change is the completion assertion; the scripts, profiles,
integration modules, production APIs, and R1/R2 fixes remain unchanged. The
root and workspace-backed integration checks cover the Stage 4 snapshot;
subsequent changes only record completion and update roadmap status.
1. Review the complete diff against the feature roadmap. Confirm the only code
change is the order-independent test assertion; metadata selects v0.9.0;

View File

@@ -1,10 +1,9 @@
# ReleaseKit v0.9.0 adoption
Status: R1 and R2 remediation is complete in separate commits. ReleaseKit v0.9.0
adoption and the completion assertion repair remain planned; the root tool still
selects v0.8.0. The [implementation plan](implementation.md) owns stage order,
tasks, and validation tracking. This document owns the target and selected
choices; it does not authorize source or hosted publication.
Status: R1 and R2 remediation, ReleaseKit v0.9.0 adoption, and the completion
assertion repair are complete. The [implementation plan](implementation.md)
records stage order, tasks, and validation evidence. This document owns the
target and selected choices; it does not authorize source or hosted publication.
## Purpose and authority
@@ -150,8 +149,8 @@ The completion assertion compares the expected alias source/target records
without depending on their iteration order, while detecting missing, unexpected,
or duplicate records. Its routing and visible-completion assertions remain.
Production alias ordering and public contracts are unchanged. This correction
remains part of the maintenance scope, separate from completed R1/R2 remediation;
the implementation plan owns the test changes and focused verification.
was completed as part of the maintenance scope, separate from R1/R2 remediation;
the implementation plan records the test changes and focused verification.
Ordinary releases retain their single selected-module publication suite and
separate hosted-delivery outcome. One-time upgrade diagnostics are maintenance