Route spell extraction through core preparation with remaining extractors pending
This commit is contained in:
@@ -363,6 +363,11 @@ allocation, report delivery, and invocation finalization remain at existing owne
|
||||
|
||||
## Stage 7 — Wire Typed Extraction And Migrate The Spell Pilot
|
||||
|
||||
**Status:** Complete. The spell and pipeline checks pass. The broader modules
|
||||
check is deferred: the other D&D extractors and integration fixtures still use
|
||||
the previous extraction interface. Migrate the extractors in their assigned
|
||||
work and repair the remaining assembled fixtures by the cutover completion.
|
||||
|
||||
**Goal:** Prove registered extraction reaches the core executor end to end.
|
||||
|
||||
**Inspect:** `pipeline/{extractor_registry,typed_execution,prepare,runner_concurrent}.go`,
|
||||
|
||||
Reference in New Issue
Block a user