# Stage-Specific Glossary Inputs
|
||||
|
||||
**Updated:** 2026-11-07
|
||||
|
||||
**Status:** Accepted scope for the next Audita major release. Initial outline;
|
||||
detailed design and implementation remain pending. The
|
||||
[master roadmap](library-adoption.md) owns sequencing and release completion.
|
||||
|
||||
## Baseline and Target
|
||||
|
||||
The current [CLI](../cli.md) accepts one glossary input for a processing run.
|
||||
The [pipeline configuration](../config.md) supports repeated glossary stages,
|
||||
but does not select a different glossary input for each occurrence.
|
||||
|
||||
Allow operators to run ordered glossary stages against different glossary inputs
|
||||
within one processing run. For a D&D transcript, the first glossary stage can
|
||||
use `party.yml` and the second can use `spells.yml`. Each stage uses its selected
|
||||
glossary and processes the transcript resulting from earlier stages. Operators
|
||||
need not combine those inputs into one glossary or run Audita separately for
|
||||
each pass.
|
||||
|
||||
This example describes the intended behavior, not a selected configuration syntax.
|
||||
The major-release policy permits a hard cutover; the current single-glossary CLI
|
||||
and pipeline representation do not constrain the target design.
|
||||
|
||||
## Sequencing and Work Outline
|
||||
|
||||
Implement after ConfigKit, PromptKit, CommandKit, and ReleaseKit adoption, and
|
||||
before final release validation and preparation. This lets the feature use the
|
||||
adopted configuration and CLI conventions and avoids adapting it twice. Keep the
|
||||
requirement visible during library design without expanding those migrations
|
||||
into feature implementation.
|
||||
|
||||
1. Define how a stage selects its glossary, how input paths resolve, and how
|
||||
defaults and CLI selection interact with stage configuration.
|
||||
2. Carry the selected glossary through loading, stage execution, proposal
|
||||
generation, and validation. Review glossary consumers outside the glossary
|
||||
module so their input semantics are deliberate.
|
||||
3. Make repeated stages and their selected inputs understandable in inspection,
|
||||
diagnostics, and reports. Account for all consumed glossary files in input
|
||||
handling and output-collision protection.
|
||||
4. Verify the selected behavior and update configuration, CLI, input contracts,
|
||||
pipeline documentation, maintained examples, and hard-cutover guidance as the
|
||||
implementation lands.
|
||||
|
||||
## Acceptance Direction
|
||||
|
||||
Use distinct party and spell fixtures with controlled model responses to show
|
||||
that each stage receives the intended glossary, that one stage's input does not
|
||||
leak into another, and that the second stage sees the first stage's accepted
|
||||
transcript changes. Verify meaningful errors for invalid selections or inputs,
|
||||
and retain the selected domain validation and partial-success behavior. Exact
|
||||
test cases follow the design; live provider calls are unnecessary.
|
||||
|
||||
## Open Decisions
|
||||
|
||||
Detailed choices are deliberately deferred to the feature-design discussion:
|
||||
|
||||
- Stage representation, glossary references versus inline file paths, and
|
||||
defaults or CLI overrides.
|
||||
- Which glossary is used by other modules and validators, including protected
|
||||
term checks and overlapping terms across inputs.
|
||||
- Stage identity and input attribution in inspection, errors, and reports.
|
||||
|
||||
The capability and its inclusion in the next major release are settled. These
|
||||
questions refine the design; they do not reopen whether to deliver the feature.
|
||||
@@ -1,9 +1,9 @@
|
||||
# Native Library Adoption Roadmap
|
||||
# Next Major Release Roadmap
|
||||
|
||||
**Updated:** 2026-11-07
|
||||
|
||||
**Status:** Agreed direction with proposed sequencing. Initial outlines only;
|
||||
no implementation or dependency changes have been made for this adoption.
|
||||
no implementation or dependency changes have been made for this plan.
|
||||
|
||||
## Objective and Document Ownership
|
||||
|
||||
@@ -12,9 +12,12 @@ and ReleaseKit so operators and maintainers encounter the same conventions
|
||||
across the application suite. Choose the best target state for Audita; maintaining
|
||||
compatibility with current behavior carries no weight in this major release.
|
||||
|
||||
The release also includes glossary stages that select different glossary inputs.
|
||||
This is required feature scope alongside the library upgrades.
|
||||
|
||||
This document owns shared adoption principles, sequencing, dependency selection,
|
||||
and cross-library decisions, including the ReleaseKit adoption work below. The
|
||||
linked outlines own library-specific outcomes, work, acceptance criteria, and
|
||||
linked outlines own feature-specific outcomes, work, acceptance criteria, and
|
||||
open decisions:
|
||||
|
||||
| Outline | Responsibility |
|
||||
@@ -22,10 +25,12 @@ open decisions:
|
||||
| [ConfigKit](configkit.md) | Stable configuration API, loading, discovery, presence, secrets, and provenance |
|
||||
| [PromptKit](promptkit.md) | Native resources and bundled catalog, role integration, execution, and source accounting |
|
||||
| [CommandKit](commandkit.md) | Standard operator interface, configuration commands, full ckprompt inspection, and reporting |
|
||||
| [Stage-Specific Glossary Inputs](glossary-stages.md) | Ordered glossary stages that select different input files |
|
||||
|
||||
These four documents replace the removed `import-upgrade.md`. They retain its
|
||||
relevant technical evidence but supersede its recommendations to disable the
|
||||
OpenRouter bundle, defer CommandKit adoption, limit standard inspection, or
|
||||
This master roadmap and the three library outlines replace the removed
|
||||
`import-upgrade.md`. They retain its relevant technical evidence but supersede
|
||||
its recommendations to disable the OpenRouter bundle, defer CommandKit adoption,
|
||||
limit standard inspection, or
|
||||
preserve Audita's backend ownership restrictions without a domain justification.
|
||||
They do not select unrelated work in [future.md](future.md).
|
||||
|
||||
@@ -107,6 +112,8 @@ for Audita's complete release workflow.
|
||||
application-only credential rules, finite admission, and preference for
|
||||
standard-library CLI parsing. Update policies with adopted behavior; do not
|
||||
silently treat old integration choices as permanent requirements.
|
||||
Keep stage-specific glossary inputs in view when choosing configuration and
|
||||
CLI contracts; detailed feature design and implementation follow adoption.
|
||||
2. **Prepare toolchain and migration work.** Select Go 1.27 or newer, updating
|
||||
source/build requirements, CI/bootstrap assumptions, release instructions,
|
||||
and toolchain attribution. Upgrade the direct ReleaseKit tool, launcher, and
|
||||
@@ -121,12 +128,17 @@ for Audita's complete release workflow.
|
||||
previously designed operator interface, adapting Audita domain handlers and
|
||||
resolving upstream issues. This is required target scope, not an optional
|
||||
follow-up whose justification is deferred.
|
||||
5. **Validate and document the assembled application.** Complete the offline
|
||||
5. **Add stage-specific glossary inputs.** After all four library adoptions,
|
||||
complete the [glossary-stage roadmap](glossary-stages.md). Use the adopted
|
||||
configuration, resource, and CLI conventions to support ordered stages such
|
||||
as `party.yml` followed by `spells.yml` in one processing run. This sequencing
|
||||
avoids designing the feature around interfaces that the upgrades replace.
|
||||
6. **Validate and document the assembled application.** Complete the offline
|
||||
behavioral checks from the outlines and the full Audita suite. Update canonical
|
||||
configuration, CLI, operations, integration, and internal documentation with
|
||||
implementation; provide maintained examples and hard-cutover guidance. Validate
|
||||
the adopted release workflow without publishing a release.
|
||||
6. **Prepare the next major release.** Public configuration, inspection, and CLI
|
||||
7. **Prepare the next major release.** Public configuration, inspection, and CLI
|
||||
changes warrant a major release under [release policy](../policy/release.md).
|
||||
Exact numbering and publication timing remain release-preparation work. Use
|
||||
the adopted ReleaseKit workflow and selected upstream validators; document
|
||||
@@ -179,9 +191,10 @@ provider calls and do not prove migrated Audita behavior or cross-platform
|
||||
execution. Use controlled provider boundaries and proportionate tests under
|
||||
[testing policy](../policy/testing.md); live diagnostics are not release gates.
|
||||
|
||||
Completion requires all four adoption targets, resolved decisions, migrated
|
||||
examples, useful native inspection, the selected domain behavior, a passing
|
||||
assembled application, and the adopted ReleaseKit workflow. Every retained local
|
||||
Completion requires all four library adoption targets, stage-specific glossary
|
||||
inputs, resolved decisions, migrated examples, useful native inspection, the
|
||||
selected domain behavior, a passing assembled application, and the adopted
|
||||
ReleaseKit workflow. Every retained local
|
||||
release validator must have a domain-specific justification. Acceptance tests
|
||||
must assert the target contracts; update or remove tests whose sole purpose is
|
||||
preserving superseded behavior. Upstream requests need an explicit disposition
|
||||
|
||||